Corner perspective of retail unit with a short front open plan, 39m2, built with stone finish fast build sustainable construction technology and cross laminated timber, product R039E Boxa Possibilities
Front perspective of retail unit with a short front open plan, 39m2, built with stone finish fast build sustainable construction technology and cross laminated timber, product R039E Boxa Possibilities
Side perspective of retail unit with a short front open plan, 39m2, built with stone finish fast build sustainable construction technology and cross laminated timber, product R039E Boxa Possibilities

R039E

Retail Space 39E

Footprint

39 m²

  • 34 m2 internal floor area

  • Short front elevation

  • Multiple glazing configuration options

  • Built-in 7 days

  • Cross Laminated Timber (CLT) or Polyblock walls

  • Off-grid, hybrid & mains services options

Available From

BOX (building envelope):

R493,000 ex. VAT

Fixtures, Fittings & Decking / Access:

R27,000 ex. VAT

Outside South Africa: 10-20%

Rest of South Africa: 5-10%

Gauteng: 3-5%

Logistics Allowances

Plan View

  • All design & engineering

  • Supply & installation

  • Certificates of Compliance (Electricity & plumbing as relevant)

  • Internal white painted wall finish (Polycare walls), treated CLT internal face (timber walls)

  • Doors / windows / flashing colour options (within standard colour specification)

  • All electrical & sanware fittings  (to standard BOXA specification)

  • Electrical, water and sewer connections (client to bring connections within 2m of unit)

  • Decking and access ramps (as shown on plan)

  • Turnkey handover

  • 12 month warranty on workmanship

  • Enabling, landscaping and site works (if required)

  • Off-grid technologies (rainwater harvesting, solar etc)

  • Specialist / additional footings and structural specifications required  for ground conditions with unsuitable bearing capacity

  • Additional roof / structural specifications for high wind & extreme weather prone areas or other relevant environmental or site conditions.

  • Local authority approvals, planning submissions and consent

  • Furniture & Joinery

Includes

Extras